Concepedia

Concept

manufacturing planning

Parents

Children

10.6K

Publications

468.8K

Citations

18.8K

Authors

3.4K

Institutions

Manufacturing Strategy-Driven Planning

1980 - 1987

Manufacturing planning research during 1980–1987 converged on strategic–operational integration, emphasizing hierarchical production planning for rolling-horizon planning and cross-level objective alignment, and advanced lot-sizing that blends analytical models with heuristics under capacity and lead-time constraints. Studies on Flexible Manufacturing Systems focused on modeling, control policies, and performance evaluation in computer-controlled environments, with nonlinear integer formulations and loading strategies guiding system performance. Scheduling across multi-stage, multi-item networks with capacity constraints was explored via network programming to identify bottlenecks and improve throughput, while efforts to integrate group technology with material requirements planning expanded planning horizons and practice.

Hierarchical production planning decomposes complex manufacturing systems into aggregate and detailed levels, enabling rolling-horizon planning, disaggregation, and cross-level objective alignment [4], [9], [15], [19].

Lot sizing in multi-level and multi-stage settings integrates capacity and lead-time considerations, blending analytical formulations with heuristics to reduce costs and improve responsiveness [8], [7], [2], [12].

Flexible Manufacturing Systems research emphasizes modeling, control policies, and performance evaluation under computer-controlled environments, including nonlinear integer formulations and loading strategies [1], [3], [13].

Scheduling across multi-stage, multi-item networks with capacity constraints is explored via network programming and policy studies to identify bottlenecks and improve throughput [20], [11], [18].

MRP/GT integration and education frameworks explore translating group technology concepts to MRP and planning horizons, guiding production planning practice [6], [19].

Group Technology Planning

1988 - 1994

Strategy-Driven Manufacturing Planning

1995 - 2001

Enterprise-Wide Optimization

2002 - 2008

Integrated Planning under Uncertainty

2009 - 2015

Energy-aware Reconfigurable Planning

2016 - 2017

Integrated Additive Manufacturing Scheduling

2018 - 2024